Overview of Microgrid Results

Microgrid Name Generation Bus Minimum 1 hr Load (kW) Average 1 hr Load (kW) Average Daytime 1 hr Load (kW) Maximum 1 hr Load (kW) Maximum 1 hr Critical Load (kW) Existing Fossil Generation (kW) New Fossil Generation (kW) Existing Solar (kW) New Solar (kW) Existing Battery Power (kW) Existing Battery Energy Storage (kWh) New Battery Power (kW) New Battery Energy Storage (kWh) Existing Wind (kW) New Wind (kW) Total Generation on Microgrid (kW) Renewable Generation (% of Annual kWh) Emissions (Yr 1 Tons CO2) Emissions Reduction (Yr 1 % CO2) Average Outage Survived (h) O+M Costs (Yr 1 $ before tax) CapEx ($) CapEx after Tax Incentives ($) Net Present Value ($)
mg0 634 60 178 247 306 306 0 123 0 514 0 0 102 293 200 166 1,105 86 111 86 95 24,650 1,585,377 984,437 280,821
mg1 675 243 453 574 861 713 0 376 0 1,143 685 753 0 0 0 965 2,665 83 349 82 574 62,919 3,267,242 1,729,510 1,308,088
Summary None 323 630 821 1,163 1,019 0 499 0 1,657 685 753 102 293 200 1,131 3,770 84 460 83 95 87,569 4,852,619 2,713,947 1,588,909

Report Generated

2024-02-01 02:00:08.202203

User Warnings

Supporting critical loads across microgrids assumes an AMI metering system. If not currently installed, add budget for the creation of an AMI system.
Supporting critical loads across microgrids assumes the ability to remotely disconnect 3-phase loads.

Distribution Upgrades needed to create Microgrids

Microgrid Location Recommended Upgrade Cost Estimate ($)
mg0 mg0 Microgrid Design 100,000
mg0 mg0 Microgrid Controls 100,000
mg0 632633 SCADA disconnect switch 50,000
mg0 634a_data_center AMI disconnect meter 300
mg0 634b_radar AMI disconnect meter 300
mg0 634c_atc_tower AMI disconnect meter 300
mg1 mg1 Microgrid Design 100,000
mg1 mg1 Microgrid Controls 100,000
mg1 671692 SCADA disconnect switch 50,000
mg1 675a_hospital 3-phase relay 20,000
mg1 675b_residential1 3-phase relay 20,000
mg1 675c_residential1 3-phase relay 20,000
mg1 692_warehouse2 3-phase relay 20,000

Description